LEXUS RX 300

1998 — 2003 of release

Repair and car operation



RX 300 Lexus
+ Lexus RX-300 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
+ Engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ the Power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
+ Automatic transmission and interaxal differential
+ Transmission line
+ Brake system
- Suspension bracket and steering
   General information
   + Forward suspension bracket
   + Back suspension bracket
   + Steering
   - Suspension bracket geometry
      Corners of installation of wheels of the car - the general information
      Check and adjustment of corners of installation of forward wheels
      Check and adjustments of corners of installation of back wheels
+ Body
+ Onboard electric equipment
+ Schematic diagrams of electric connections




Check and adjustments of corners of installation of back wheels

Check

 PERFORMANCE ORDER

  1. Measure suspension bracket height (see. Section Check and adjustment of corners of installation of forward wheels).
  2. Establish the car on the measuring stand and check disorder and convergence of back wheels.
  3. If size of disorder there do not correspond to requirements of Specifications of Head the Suspension bracket and a steering, check suspension bracket components on existence of damages and wear.

Disorder of back wheels is not regulated.

  1. If size of convergence there do not correspond to requirements of Specifications of Head the Suspension bracket and a steering, adjust convergence.

Convergence adjustment

 PERFORMANCE ORDER

  1. Measure distance from a disk of each back wheel to a corner of the clown of adjustment of convergence.
  1. If a difference between the measured distances more than 3.0 mm, weaken a bolt of the clown and turn the clown on a corner demanded for installation of average spetsifikatsionny value of convergence.
  1. After adjustment tighten a bolt with effort of 113 Nanometers.