LEXUS RX 300

1998 — 2003 of release

Repair and car operation



RX 300 Lexus
+ Lexus RX-300 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
+ Engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ the Power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
- Automatic transmission and interaxal differential
   General information
   Search of malfunctions - the general information
   Replacement of sensors
   Removal and installation of assembly of AT valves
   Checks and AT adjustments
   Removal and installation of a cooler of ATF
   Removal and installation of assembly of the lever of the selector of AT modes
   Removal and AT installation
+ Transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Schematic diagrams of electric connections




Removal and installation of assembly of AT valves

 PERFORMANCE ORDER

  1. Remove the bottom protective casing of an impellent compartment, turn out a drain stopper and empty AT.
  1. Turn out 18 bolts of fastening of the pallet of a case of AT, remove the pallet and disconnect from it laying.
  2. Remove magnets and collect with their help metal particles from the pallet of a case of AT. Examine metal particles on a magnet and on the pallet – steel particles (being magnetized) indicate wear of bearings, gear wheels and washers, instead of being magnetized (copper or brass) – on wear of plugs.
  1. Turn out 3 bolts and remove a maslozabornik with a sealing ring.
  1. Separate sockets of five Ý/m switching valves.
  2. Turn out a bolt, remove a lock plate and remove the sensor of temperature of ATF (see. Section Replacement of sensors).
  3. Liberate electroconducting from two holders.
  1. Turn out 17 bolts and remove assembly of valves.

Do not drop assembly of the control valve, a spring and the accumulator piston.


  1. Remove the case of the control valve, a spring and three laying.
  1. Turn out 5 bolts and remove 5 Ý/m switching valves.
  1. Installation is made as it should be, the return to an order of dismantle of components, tighten fixture with demanded efforts, use new laying and sealing rings.