LEXUS RX 300

1998 — 2003 of release

Repair and car operation



RX 300 Lexus
+ Lexus RX-300 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
- Engine
   General information and preparatory operations
   Check of kompressionny pressure
   Engine check by means of the vacuum gage
   Reduction of the piston of the first cylinder in the provision of the top dead point (VMT)
   Check of a corner of an advancing of ignition
   Removal, check and installation of a belt of a drive of GRM of its natyazhitel, pulley and cogwheel of a cranked shaft, cogwheels of camshafts and intermediate rollers
   Removal, dismantling, check, assembly and installation of a head of cylinders and its components
   Removal and engine installation, check of support
   Block of cylinders
   Check Д/В of pressure of impellent oil
   Removal, dismantling, check, assembly and installation of the oil pump and case pallet
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ the Power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
+ Automatic transmission and interaxal differential
+ Transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Schematic diagrams of electric connections




Removal, check and installation of a belt of a drive of GRM of its natyazhitel, pulley and cogwheel of a cranked shaft, cogwheels of camshafts and intermediate rollers

Removal

Components which are subject to removal for access to drive of GRM

1 — the Protective casing of a wing
2 — the Belt of a drive of the generator
3 — the Belt of a drive of the pump GUR
4 — the Activator темпостата
5 — I Will corrode activator electroconductings темпостата
6 — grounding Sockets
7 — Draught of fastening of the engine
8 — the Right arm of No. of 2 fastenings of the engine
9 — the Top strut of an impellent compartment
10 — the Tank of brake liquid
11 — I Will corrode electroconductings Д/В of pressure of GUR liquid

12 — an EVAP system Hose
13 — I Will corrode MAF sensor electroconductings
14 — an air purifier Cover
15 — the Air filter
16 — the air purifier Case
17 — a compression Spring
18 — Laying
19 — Forward section No. 2 of an exhaust pipe
20 — the Catalytic converter
21 — the Pump GUR
22 — the Decorative cover of the engine


 PERFORMANCE ORDER

  1. Remove a fairing of a windscreen and the top strut of an impellent compartment (9) (see. Head Body).
  2. Remove a forward right wheel and a protective casing of a wing (1).
  3. Remove a belt of a drive of the generator and a belt of a drive of the pump GUR (2 and 3) (see. Section Check of a condition and replacement of belts of a drive of auxiliary units).
  4. Remove the activator темпостата (4).
  5. Separate sockets of grounding (6).
  6. Remove draft and the right arm of No. of 2 fastenings of the engine (7 and 8).
  1. Turn out a sharnirny bolt and a nut then remove an arm of fastening of the generator.
  1. Holding a pulley of a cranked shaft from a provorachivaniye by means of the special adaptation, turn out the central bolt of fastening of a pulley and remove it

Drive of GRM and accompanying components

1 — the Cover of No. 2 belts of a drive of GRM
2 — Sealing laying
3 — the Belt of a drive of GRM
4 — the Right basic arm of the engine
5 — Directing a belt of a drive of GRM
6 — the Cover of No. of 1 belt of a drive of GRM
7 — the Pulley of a cranked shaft
8 — Sealing laying
9 — the Arm of No. of 2 fastenings of the generator
10 — the Protector of a plait of electroconducting of the engine

11 — the Cogwheel of a camshaft of the right number of cylinders
12 — Top (No. 2) an intermediate roller
13 — the Cogwheel of a camshaft of the left number of cylinders
14 — Nizhny (No. 1) an intermediate roller
15 — Tarelchataya a washer
16 — the Boot
17 — the Cogwheel of a cranked shaft
18 — Assembly of a natyazhitel of a belt of a drive of GRM
19 — the Holding plate of a cogwheel of a cranked shaft


 PERFORMANCE ORDER

  1. Turn out 4 bolts and uncover No. of 1 belt of a drive of GRM (6).
  2. Remove directing a belt of a drive of GRM (5).
  3. Wring out clamps of a protector of a plait of electroconducting of the engine from a cover of No. 3 belts of a drive of GRM, turn out 5 bolts and uncover No. 2 belts of a drive of GRM.
  4. Turn out 2 bolts and remove the right basic arm of the engine.
  1. Bring the piston of the first cylinder into situation VMT. For this purpose temporarily screw a bolt of fastening of a pulley of a cranked shaft and, turning for it a shaft clockwise, combine an opening on a shaft cogwheel with dredging on the case of the oil pump.
  1. Make sure that VMT of the end of a step of compression – labels on cogwheels of camshafts is reached and on a cover of No. 3 belts of a drive of GRM should coincide. If it did not occur turn a cranked shaft on one complete revolution.
  1. Turn out a bolt of fastening of a pulley of a cranked shaft.
  2. If the belt of a drive of GRM is supposed to be used repeatedly, before its removal it is necessary to make sure that 3 adjusting labels and a forward label are put on it. If these labels are erased, put them anew.

The laying and label scheme on a belt of a drive of GRM
1 — the Cogwheel of a cranked shaft
2 — the Roller of the water pump
3 — the Cogwheel of a camshaft of the left number of cylinders
4 — the Top intermediate roller (No. 2)
5 — the Cogwheel of a camshaft of the right number of cylinders
6 — Nizhny an intermediate roller (No. 1)

  1. Serially turn out two bolts of fastening of a natyazhitel of a belt of a drive of GRM and remove it together with a boot (16 and 18).
  2. Remove a belt from cogwheels.
  3. Holding cogwheels of camshafts from a provorachivaniye by means of special adaptations, turn out the central bolts of their fastening and remove cogwheels (11 and 13).

Remember an arrangement of cogwheels or mark them that then to establish each cogwheel on the corresponding shaft.

  1. Turn out a bolt of fastening of the top intermediate roller (12) and remove it.
  2. Turn out a bolt of fastening of the bottom intermediate roller and remove it together with a tarelchaty washer (14 and 15).
  3. Remove holding plate of a cogwheel of a cranked shaft (19) and by means of the special adaptation remove a cogwheel, trying not to damage a gear wreath of a rotor of CKP located in a back part of a cogwheel.

Check

Do not allow a peregibaniye and a perekruchivaniye, a belt of a drive of GRM, and also hit on it of oil, OZh and fuel. Do not use a natyazhitel of a belt for fixing cranked or a camshaft from a provorachivaniye at a tightening of bolts of fastening of cogwheels. Do not allow a provorachivaniye of shaft at the removed belt of a drive of GRM more than on some degrees for combination of teeths.


 PERFORMANCE ORDER

  1. Check a condition of the GRM belt removed from the engine. Complete or partial loss of teeths can lead to jamming of camshafts.
  1. At identification of cracks or signs of appreciable wear of the outer side of a belt check working surfaces of intermediate rollers and a roller of the water pump on existence задиров and agnails.
  2. If unilateral wear of a belt takes place, check a condition of a directing plate and track correctness of combination of cogwheels and intermediate rollers.
  3. Replacement of a belt should be made according to the Schedule of routine maintenance of the car (see. Head of Control and routine maintenance of the car). The belt which was in a doubtful condition is subject to replacement without fail. Before installation of a new belt try to reveal and liquidate all reasons which have led to premature failure of the old.

It is recommended to make replacement of a belt of a drive of GRM each time after its removal.

  1. Remove intermediate rollers and manually check ease and smoothness of rotation of their bearings. Make sure of absence excessive люфта. If necessary replace rollers.
  2. Visually check consolidation of rollers and a natyazhitel on existence of leakages of oil. If necessary replace rollers or a natyazhitel.

Consolidations of an intermediate roller

Consolidations of a natyazhitel


Existence of a thin trace of oil on an internal edge of consolidation is allowed.

  1. Holding a natyazhitel both hands in horizontal situation, rest a pusher against a firm surface and press on a natyazhitel – the pusher should not move. If a pusher утапливается, replace a natyazhitel.

Do not hold a natyazhitel a press pusher down.

  1. Measure size of a ledge of a pusher from the case of a natyazhitel of a belt of a drive of GRM. If the received value does not lie in the range of 10.0 ÷ 10.8 mm, replace a natyazhitel.

Installation

 PERFORMANCE ORDER

  1. Clear the arrangements which were in the region of a drive of GRM of a surface of dirt and oil. Wipe acetone cogwheels and do not soil them in an installation time.
  2. Having correctly developed a cogwheel concerning a shponka, plant it on a pin of a cranked shaft CKP rotor to the engine. Try not to damage a gear wreath of a rotor of CKP. Make sure of correctness of combination of labels of VMT on a wheel and the case of the oil pump, then establish holding plate of a cogwheel and tighten a bolt of its fastening with effort of 8 Nanometers.
  3. Establish intermediate rollers and tighten bolts of their fastening with demanded efforts.

At installation of an intermediate roller grease a carving part of a bolt of its fastening with fixing Loctite 242 hermetic, and also do not forget to establish a tarelchaty washer. After installation of intermediate rollers check smoothness of their rotation.

  1. Having correctly developed cogwheels relatively a shponok, plant them on pins of camshafts according to the labels put at removal. Tighten bolts of fastening of cogwheels of camshafts with demanded efforts, holding pulleys from a provorachivaniye by means of the special adaptation.
  2. Make sure that cogwheels cranked and camshafts are in the provisions relevant to VMT of the piston of the first cylinder at the end of a step of compression.
  3. Establish a belt of a drive of GRM so that labels on it coincided with reciprocal labels.
  4. Drown a pusher in the case of a natyazhitel with strength of 981 ÷ 9807 N (100 ÷ 1000 kgf) and fix it in this situation, having passed, for example, a prutkovy six-sided key of 1.27 mm through openings in the case of a natyazhitel and in a pusher. Establish a boot of a natyazhitel.
  5. Establish a natyazhitel and tighten bolts of his fastening at first by hand, and then it is consecutive, with effort of 27 Nanometers. Take out a prutkovy key, having released a pusher.
  6. Turn a cranked shaft on two complete revolutions and make sure that the piston of the first cylinder is in the end of a step of compression.
  7. Establish the right basic arm of the engine and tighten a bolt of its fastening with effort of 28 Nanometers.
  1. Examine laying of a cover of No. 2 belts of a drive of GRM. If integrity of laying is broken, replace it, previously having removed all traces of old laying and having cleared a cover surface. Remove from new laying a protective film or paper, establish laying exactly on the contour of a cover designated, and strongly press laying to a cover. Make sure that laying stuck to a cover.
  1. Establish a cover of No. 2 belts of a drive of GRM and tighten 5 bolts of its fastening with effort of 8.5 Nanometers.
  2. Establish a protector of a plait of electroconducting of the engine on a cover of No. 3 belts of a drive of GRM.
  3. Establish directing a belt of a drive of GRM the chashevidny party outside.
  1. Examine laying of a cover of No. of 1 belt of a drive of GRM. If integrity of laying is broken, replace it similar to cover No. 2 laying.

In places of joining of laying should not remain a gap.

  1. Establish a cover of No. of 1 belt of a drive of GRM and tighten 5 bolts of its fastening with effort of 8.5 Nanometers.
  2. Having correctly developed a pulley of a cranked shaft concerning a shponka, plant it on a shaft pin. Holding a cranked shaft from a provorachivaniye by means of the special adaptation, tighten a bolt of fastening of a pulley with effort of 215 Nanometers.
  3. Establish an arm of No. of 2 fastenings of the generator and tighten a nut of its fastening with effort of 28 Nanometers. A bolt tighten after installation of a belt of a drive of the generator.
  4. Establish in return sequence of the part which description of removal is provided above.
  5. Make a trial trip during which make sure of absence of unusual noise, pushes and delays. Make sure also of correctness of gear shifting and smoothness of a course of the car.