LEXUS RX 300

1998 — 2003 of release

Repair and car operation



RX 300 Lexus
+ Lexus RX-300 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
- Engine
   General information and preparatory operations
   Check of kompressionny pressure
   Engine check by means of the vacuum gage
   Reduction of the piston of the first cylinder in the provision of the top dead point (VMT)
   Check of a corner of an advancing of ignition
   Removal, check and installation of a belt of a drive of GRM of its natyazhitel, pulley and cogwheel of a cranked shaft, cogwheels of camshafts and intermediate rollers
   Removal, dismantling, check, assembly and installation of a head of cylinders and its components
   Removal and engine installation, check of support
   Block of cylinders
   Check Д/В of pressure of impellent oil
   Removal, dismantling, check, assembly and installation of the oil pump and case pallet
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ the Power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
+ Automatic transmission and interaxal differential
+ Transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Schematic diagrams of electric connections


надгробные памятники из мрамора фото


Removal, dismantling, check, assembly and installation of a head of cylinders and its components

Removal

 PERFORMANCE ORDER

  1. Remove a windscreen fairing (see. Head Body).
  2. Empty system of cooling of the engine (see. The section Replacement of cooling liquid (OZh)).
  3. Remove a forward right wheel and a protective casing of a wing (1 on an illustration the Components which are subject to removal for access to a drive of GRM).
  4. Remove a belt of a drive of the generator (2 on an illustration the Components which are subject to removal for access to a drive of GRM) (see. Section Check of a condition and replacement of belts of a drive of auxiliary units).
  5. Remove the pump GUR (see. Head Suspension bracket and steering).
  6. Remove forward section of an exhaust pipe (see. Head of the Power supply system and production of the fulfilled gases).
  1. Remove a decorative cover of the engine.
  1. Remove air purifier assembly (see. Section Removal and air purifier installation)
  2. Remove the activator темпостата (4 on an illustration the Components which are subject to removal for access to a drive of GRM).
  3. Remove the top strut of an impellent compartment (9 on an illustration the Components which are subject to removal for access to a drive of GRM) (see. Head Body).

Components of installation of the air distributor and inlet pipeline

1 — the Pressure head tube of GUR
2 — an air distributor Rack
3 — the Elevating hook of No. of 1 engine
4 — the EVAP system VSV Socket
5 — a weight Cable
6 — the Vacuum hose of the amplifier of brakes
7 — the grounding Tyre
8 — the ECT Д/В Socket
9 — a PCV system Hose
10 — air distributor Assembly
11 — Laying
12 — the TPS Socket
13 — the IAC valve Socket
14 — the Cable of a drive of a butterfly valve

15 — Perepuskna a hose of system of cooling
16 — the Vacuum hose
17 — a purge Hose
18 — the Clip of a fuel hose
19 — the ACIS system VSV No. 1 Socket
20 — I Will corrode grounding tires
21 — the Clamp
22 — a heater Hose
23 — the Top hose of a radiator
24 — Assembly of the inlet pipeline
25 — the injector Socket
26 — the ignition Coil
27 — the Spark plug
28 — I Will corrode ignition coils
29 — the Water waste branch pipe


 PERFORMANCE ORDER

  1. Remove air distributor assembly. For this purpose execute the following operations:
    • Disconnect the following cables and electroconducting sockets:
      • Cable of a drive of a butterfly valve;
      • Socket and TPS sensor clamps;
      • IAC valve socket;
      • VSV No. 1 sockets and ACIS system No. 2;
      • EVAP system VSV socket.
    • Turn out three bolts and disconnect a pressure head tube of GUR from the air distributor, its rack and an elevating hook of No. of 1 engine.
    • Separate the following connections:
      • PCV hose from the PCV valve on a head of the right number of cylinders (1);
      • Cable of weight and the grounding tire from the valve of management of supply of air of ACIS (2) system;
      • Weight cable from the air distributor (3);
      • Vacuum hose of the amplifier of brakes from the air distributor (4);
      • Two perepuskny hoses of system of cooling from the case of a throttle (5);
      • Hose of a podmeshivaniye of air from the case of a throttle (6);
      • Purge hose from a tube on assembly of the valve of EVAP (7) system;
      • Two vacuum hoses from the vacuum chamber of ACIS system (8);
      • Collar of electroconducting of the engine from assembly of the valve of EVAP (9) system.

Connections which are subject to dismantling

(part 1)
(part 2)
    • Remove an elevating hook of No. of 1 engine and an air distributor rack.
    • Turn out two bolts, two nuts and remove the air distributor together with laying.
  1. Separate the following connections:
    • Sockets of injectors (No. 25);
    • Submitting fuel hose from a tube (No. 18) (observe work safety rules with fuel system);
    • Heater hose from the inlet pipeline (No. 22).
  1. Turn out 9 bolts and two nuts in sequence, return shown, remove two washers. Remove the inlet pipeline, fuel distributive highways and assembly of injectors.
  1. Disconnect from a water waste branch pipe (29) sockets (8 and 20) and the top hose of a radiator (23) then turn out two bolts and two nuts, remove two washers, disconnect perepuskny a hose (15) and remove a water waste branch pipe with two laying (11).
  2. Remove ignition and spark plug coils (see. Section Check and replacement of spark plugs).
  3. Remove a belt of a drive of GRM, cogwheels of camshafts and top (No. 2) an intermediate roller (see. Section Removal, check and installation of a belt of a drive of GRM of its natyazhitel, pulley and cogwheel of a cranked shaft, cogwheels of camshafts and intermediate rollers).
  4. Liberate a plait of electroconducting of the engine from three clips on a cover of No. 3 belts of a drive of GRM (No. 10), turn out 6 bolts of fastening of a cover and remove it.

Components of installation of final collectors, sensors and electroconducting

1 — Burn down engine electroconductings
2 — the Final collector of the right number of cylinders
3 — the Rack of a final collector of the right number of cylinders
4 — Laying
5 — the VVT-i system Valve
6 — the Back plate of a head of cylinders
7 — the Sealing ring
8 — a pump GUR Arm

9 — the CKP Sensor
10 — the Cover of No. 3 belts of a drive of GRM
11 — the Epiploon
12 — the Plug
13 — the Submitting water hose
14 — Directing щупа measurements of level of impellent oil
15 — the Rack of a final collector of the left number of cylinders
16 — the Final collector of the left number of cylinders


 PERFORMANCE ORDER

  1. Remove CMP (9) sensors and valves of management of GRM (5) greasing.
  2. Give fixture and disconnect protection of electroconducting of the engine against the back, right and left parties of a head of cylinders.
Fixture of a plait of electroconducting on the back party of a head of cylinders
Fixture of a plait of electroconducting on a head of the right number of cylinders
Fixture of a plait of electroconducting on a head of the left number of cylinders
  1. Turn out two bolts and remove a back plate (No. 6) of the left head of cylinders.
  2. Turn out a bolt and disconnect submitting tube (No. 13) from a reception branch pipe. Remove a sealing ring.
  3. Turn out three bolts and remove a pump GUR arm (No. 8).
  4. Disconnect from a final collector of the right number of cylinders electroconducting of the sensor of quality of an air and fuel mix (the row 1 sensor 1), remove a rack of a collector (No. 3) and, having given 6 nuts, remove a collector (No. 2).
  5. Remove the catalytic converter (No. 20 on an illustration the Components which are subject to removal for access to a drive of GRM).
  6. Disconnect from a final collector of the left number of cylinders electroconducting of the sensor of quality of an air and fuel mix (the row 2 sensor 1), remove a rack of a collector (No. 15) and, having given 6 nuts, remove a collector (No. 16).
  7. Turn out a bolt of fastening directing щупа level of impellent oil (No. 14) and extend directing together with shchupy and a sealing ring from the case pallet.
  8. Turn out on 9 bolts of fastening of covers (1 and 13) heads of cylinders (25 and 26) and remove covers together with laying.

Components of assembly of a head of cylinders

1 — the Cover of a head of the left number of cylinders
2 — Laying
3 — Laying of a candle opening
4 — the Washer of adjustment of a klapanny gap
5 — a valve Pusher
6 — Crackers of cutting locks
7 the Plate of a klapanny spring
8 Klapannaya a spring
9 — the Saddle of a klapanny spring
10 — Maslootrazhatelny a cap
11 — the Directing plug of the valve
12 — the Valve
13 — the Cover of a head of the right number of cylinders
14 — the Wavy washer
15 — the Spring of a gear wheel of a camshaft
16 — the Cutting lock ring

17 — the Additional gear wheel of a camshaft
18 — the Inlet camshaft of the right number of cylinders
19 — the Final camshaft of the right number of cylinders
20 — the Inlet camshaft of the left number of cylinders
21 — the Final camshaft of the left number of cylinders
22 — the Filter of the valve of VVT-i system
23 — the Back cover of a head of cylinders
24 — the Segment cap
25 — the Head of the left number of cylinders
26 — the Head of the right number of cylinders
27 — Laying of a head of the right number of cylinders
28 — the Cover of the bearing of a camshaft
29 — a camshaft Epiploon
30 — Laying of a head of the right number of cylinders
31 — the Camshaft
32 — the Rotor of shift of phases GRM (VVT-i)


 PERFORMANCE ORDER

  1. Remove an inlet camshaft of the right number of cylinders. For this purpose: