LEXUS RX 300

1998 — 2003 of release

Repair and car operation



RX 300 Lexus
+ Lexus RX-300 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
+ Engine
- Systems of cooling of the engine, heating, ventilation and air conditioning
   + System of cooling of the engine
   - Systems of heating, ventilation and air conditioning
      General information
      Replacement, dismantling and To/in block assembly
      Removal, dismantling, assembly and installation of the block of the fan of a heater
      Check and compressor and K/V magnetic coupling replacement
      Removal and To/in condenser installation
      Checks of components of systems of heating and To/in
      Removal and control unit installation
+ the Power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
+ Automatic transmission and interaxal differential
+ Transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Schematic diagrams of electric connections




Replacement, dismantling and To/in block assembly

Components of installation of the To/in block

1 — the Intensifying bar
2 — Nizhny a heater branch pipe
3 — the Liquid tube
4 — the Soaking-up tube
5 — the Water hose
6 — the Block of the fan of a heater
7 — the Sealing ring

8 — Burn down electroconductings
9 — the Air line
10 — the Central air line from a heater to a zaslonka
11 — the To/in Block
12 — the Air line of a box of the console No. 1
13 — the Holder No. 1
14 — the Holder No. 2

Components of assembly of the To/in block

1 — Burn down electroconductings
2 — Consolidation
3 — the Connecting flange of tubes
4 — the Sealing ring
5 — the Broad valve
6 — Tubes and fittings
7 — the Arm
8 — the Sensor of temperature of the evaporator
9 — an arm Plate
10 — the Air line

11 — the Evaporator
12 — the Cover
13 — the Isolating pallet
14 — Э / the motor of mixing of air
15 — Э / the motor of production of air
16 — the Drain hose
17 — a heater Radiator
18 — the Relay э / the heater motor
19 — the Casing

Removal

 PERFORMANCE ORDER

  1. Discharge a contour of coolant К/В.
  2. Empty a radiator of system of cooling of the engine (see. The section Replacement of cooling liquid (OZh)).

To empty system of cooling of the engine completely there is no sense.

  1. Remove levers and э / the motor of screen wipers, the left and right fairing of a windscreen, a cowl and the dashboard with an intensifying bar (see. Head Body).
  2. Disconnect from the To/to block liquid and soaking-up tubes.
  3. Disconnect water hoses from tubes of the heat exchanger of a heater.
  4. Remove the block of the fan of a heater (see. Section Removal, dismantling, assembly and installation of the block of the fan of a heater).
  5. Wring out two clamps and disconnect the bottom branch pipe of a heater from the central air line.
  6. Remove an air line of a box of the console No. 1.
  7. Separate the socket, turn out two bolts and two nuts and remove the К/В block.

Dismantling and check

 PERFORMANCE ORDER

  1. Separate the electroconducting socket, turn out two screws and remove э / the motor of production of air.
  2. Remove a plait of electroconducting and an arm.
  1. Turn out two screws, remove two plates and pull out the heater heat exchanger.
  1. Remove the relay э / the motor of the fan of a heater.
  2. Turn out two screws and remove э / the motor of mixing of air.
  3. Separate the socket of the sensor of temperature of the evaporator, weaken sensor clamps on a plate of an arm and remove the sensor.
  4. Remove the broad valve and as soon as possible закупорьте its adjusting flange.
  5. Remove an air line from the driver.
  6. Turn out bolts of fastening of tubes to the evaporator and remove tubes with fittings.
  7. Turn out 7 screws and uncover the evaporator. Extend the evaporator.
  8. Check and if necessary clean cells of an ispravitel and the radiator heat exchanger the compressed air.
  9. Check serviceability of functioning driving э / motors.

Assembly and installation

 PERFORMANCE ORDER

  1. Assembly and installation are made as it should be, the return to an order of dismantle of components. Pay attention to the next moments:
    • Use new sealing rings on connections of refrigerator lines with the To/in block, and also tubes with the broad valve and with the evaporator.
    • Collars of fastening of water hoses to the heat exchanger establish at distance from 1 to 7 mm from the hose end.
    • Level a label on a drain hose.