LEXUS RX 300

1998 — 2003 of release

Repair and car operation



RX 300 Lexus
+ Lexus RX-300 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
+ Engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
- Power supply system and production of the fulfilled gases
   - Power supply system
      General information and security measures
      Sbrasyvaniye of pressure in fuel system
      Principle of functioning of a control system of fuel injection
      Checks of system of injection
      Removal and installation of the fuel pump, sensor of a stock of fuel and regulator of pressure of fuel
      Removal and installation of fuel distributive highways and injectors
      Removal and installation of a fuel tank and fuel lines
      Removal and air purifier installation
      Removal, installation and adjustment of the case of a throttle and TPS sensor
      Removal and installation of components of ACIS system
   + Systems of release and decrease in toxicity of the fulfilled gases
+ Systems of electric equipment of the engine
+ Automatic transmission and interaxal differential
+ Transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment
+ Schematic diagrams of electric connections




Removal, installation and adjustment of the case of a throttle and TPS sensor

Removal and installation

Components of installation of the case of a throttle

1 — Laying
2 — the throttle Case
3 — Perepuskna a hose of system of cooling
4 — the Cable of a drive of a butterfly valve

5 — an air purifier Hose
6 — the Vacuum hose
7 — the Air hose
8 — the Smoothing receiver

Components of assembly of the case of a throttle

1 — Section No. of 3 cases of a throttle
2 — the Protective plate
3 — the Sealing ring
4 — the TPS Sensor

5 — Section No. of 1 case of a throttle
6 — Laying
7 — Section No. of 2 cases of a throttle
8 — the IAC Valve


 PERFORMANCE ORDER

  1. Empty system of cooling of the engine (see. The section Replacement of cooling liquid (OZh)).
  2. Disconnect a cable of a drive of a butterfly valve and remove an air purifier hose (see. Section Removal and air purifier installation).
  3. Separate sockets of electroconducting of the TPS sensor and лапана IAC.
  4. Disconnect from the throttle case perepuskny hoses of system of cooling of the engine, a hose of a podmeshivaniye of the air, two hoses of giving of fuel evaporations and a vacuum hose.
  5. Give 3 nuts and remove the throttle case together with laying.
  6. At installation use new laying between the case of a throttle and the air distributor. Tighten fixture with demanded efforts.
  7. At TPS sensor installation at first put it to the throttle case, having turned on a corner 30÷60 a hail. clockwise, and then fix the sensor, having turned it against an hour hand.

Adjustment

 PERFORMANCE ORDER

  1. Giving a lock-nut and the adjusting screw on the opening party, expose a gap between a screw head and the throttle lever on the party No. 1 (see illustrations).
  2. Gradually tightening the screw, bring it into situation in which it starts to concern the lever.

Do not draw the screw. Then turn out the screw on a turn quarter. Also fix it in this situation by a lock-nut.

  1. Repeat the described adjustment for the screw on the opening party.

The adjusting screw from the provision of contacts with the lever should be tightened on 1/2÷3/4 a turn.

  1. In summary check the throttle case (see. Section of Check of system of injection).